Quai Joannes Couvert

  • Civil engineering works
  • Coastal and river engineering - Underwater works

    • Improvement and development of embankments
    • Marine Renewable Energies
    • Deep foundations
    • Industrial civil engineering, silos, confinement
    • Heavy port infrastructures (quays, piers, dolphins, breakwaters, etc.)
Joannes Couvert

Start of works

Project owner

Haropa Port

Contract

  • Water and energy
  • Renewable energy

Prime contractor

Grand Port Maritime du Havre

Total of works Excl. TVA

Construction location

Le Havre / France

Offers & solutions

  • Execution of port structures
  • Rehabilitation of infrastructure (diagnostics and sizing, methods, execution)

Worksite figures

  1. 182 000 tonnes de terrassement

  2. 120 000 m3 de dragage

  3. Capacité de charge de 30 tonnes par mètre carré

  4. 5 000 tonnes d’armatures