Par éolien de la Turballe
- Coastal and river engineering - Underwater works
- Air Terminal / Railway Stations / Port Terminal
- Marine Renewable Energies
- Heavy port infrastructures (quays, piers, dolphins, breakwaters, etc.)
- Underwater / diver works
Start of works
2020Project owner
EDF RenouvelablesContract
- Water and energy
- Renewable energy
Prime contractor
SCETotal of works Excl. TVA
Construction location
La Turballe / FranceOffers & solutions
- Rehabilitation of infrastructure (diagnostics and sizing, methods, execution)
Worksite figures
294 m2 de ponton
6 pieux
