Rénovation de l'écluse de Bois-le-Roi
- Coastal and river engineering - Underwater works
- Dams, locks, pipe for discharging
Start of works
2022Project owner
Voies Navigables de FranceContract
- Water and energy
- Water
- Marine
Prime contractor
BIEF / CARICAIE / MATIERETotal of works Excl. TVA
Construction location
Bois-le-Roi / FranceOffers & solutions
- Infrastructure repairs
- Solutions de renforcement et de réhabilitation (diagnostic et dimensionnement, méthode, réalisation)
Worksite figures
80 tonnes d'armature
77 tirants d'ancrage
