Tronçon T3A - Ligne 15 Grand Paris Express
- Coastal and river engineering - Underwater works
- Heavy port infrastructures (quays, piers, dolphins, breakwaters, etc.)
Start of works
2017Project owner
Société du Grand ParisContract
- Transportation
Prime contractor
SETEC/IngéropTotal of works Excl. TVA
12 €Construction location
Boulogne-Billancourt / ParisOffers & solutions
- Specialized intervention (limited time, premises occupied, tight constraints, etc.)
Worksite figures
21 mètres de long
17 tonnes
800 tonnes de produits sidérurgiques
