Restructuration et extension de la gare RER A Vincennes
- Civil engineering works
- Special works / Maintenance
- Air Terminal / Railway Stations / Port Terminal
Start of works
2019Project owner
RATPContract
- Transportation
- Railway
Prime contractor
Total of works Excl. TVA
Construction location
Vincennes / FranceOffers & solutions
- Specialized intervention (limited time, premises occupied, tight constraints, etc.)
Worksite figures
- •1 800 m3 de terrassement / démolition
- 100 ml de parois berlinoises
- 100 T de charpente métallique
- 1 200 m² de pierre de Bourgogne
