Clichy riverbanks
Localized protection and safety works on the riverbanks of Clichy. Supply and installation of metal piles. Demolition in and out of water, excavation out of water, dredging including evacuation, supply and installation of riprap in water. Supply and installation of riprap out of water. Prefabrication and installation of reinforced concrete elements. Reinforced concrete structures poured on site. Rubblework.
- Coastal and river engineering - Underwater works
- Improvement and development of embankments


Start of works
2010Project owner
CG 92Contract
- Transportation
- Marine
Prime contractor
CG 92Total of works Excl. TVA
1 490 000Construction location
Clichy / FranceOffers & solutions
- Reinforcement and restoration solutions (diagnostics and sizing
- methods
- execution)
Worksite figures
- 200 m3 of stonework
- 48 x 13-m piles
- 200 tonnes of riprap
- 200 m