Turcot interchange - installation of an FRP structure

Installation of a staircase in the Girouard tower

  • Civil engineering works

    • Industrial civil engineering
    • silos
    • confinement
echangeur-turcot-installation-de-structure-frp-psm-technologies-ouvrages-d-art-et-genie-civil-1
echangeur-turcot-installation-de-structure-frp-psm-technologies-ouvrages-d-art-et-genie-civil-2 echangeur-turcot-installation-de-structure-frp-psm-technologies-ouvrages-d-art-et-genie-civil-3 echangeur-turcot-installation-de-structure-frp-psm-technologies-ouvrages-d-art-et-genie-civil-4 echangeur-turcot-installation-de-structure-frp-psm-technologies-ouvrages-d-art-et-genie-civil-5

Start of works

2016

Project owner

Demathieu et Bard inc

Contract

  • Transportation
  • Roadway

Prime contractor

xx

Total of works Excl. TVA

50 000

Construction location

Montréal / Canada

Offers & solutions

  • Specialized Interventions

Worksite figures

  1. 30-m high
  2. 12 days of work