ACM2S mooring Dolphin

Total replacement of the west oil terminal pier mooring dolphin. Installation of a guide tube, procurement and installation of the dolphin by flotation and ballasting, embedding of tube base in bore, installation and embedding of the cap with the tube, reinforcement and concreting of the tube head, installation of mooring hook and removal of damaged dolphin after cut off.

  • Coastal and river engineering - Underwater works

    • Heavy port infrastructures (quays
    • piers
    • dolphins
    • breakwaters
    • etc.)
duc-d-albe-acm2s-etpo-nantes-travaux-publics-travaux-maritimes-et-fluviaux-travaux-sous-marins-1
duc-d-albe-acm2s-etpo-nantes-travaux-publics-travaux-maritimes-et-fluviaux-travaux-sous-marins-2 duc-d-albe-acm2s-etpo-nantes-travaux-publics-travaux-maritimes-et-fluviaux-travaux-sous-marins-4 duc-d-albe-acm2s-etpo-nantes-travaux-publics-travaux-maritimes-et-fluviaux-travaux-sous-marins-5

Start of works

2016

Project owner

GRAND PORT MARITIME DE LA ROCHELLE

Contract

  • Transportation
  • Marine

Prime contractor

GRAND PORT MARITIME DE LA ROCHELLE

Total of works Excl. TVA

2 300 000

Construction location

La Rochelle / France

Offers & solutions

  • Execution of port structures

Worksite figures

  1. Dolphin length: 32.70 m - Weight: 64 tonnes
  2. 250 tonnes: installation of mooring hook