ACM2S mooring Dolphin
Total replacement of the west oil terminal pier mooring dolphin. Installation of a guide tube, procurement and installation of the dolphin by flotation and ballasting, embedding of tube base in bore, installation and embedding of the cap with the tube, reinforcement and concreting of the tube head, installation of mooring hook and removal of damaged dolphin after cut off.
- Coastal and river engineering - Underwater works
- Heavy port infrastructures (quays
- piers
- dolphins
- breakwaters
- etc.)




Start of works
2016Project owner
GRAND PORT MARITIME DE LA ROCHELLEContract
- Transportation
- Marine
Prime contractor
GRAND PORT MARITIME DE LA ROCHELLETotal of works Excl. TVA
2 300 000Construction location
La Rochelle / FranceOffers & solutions
- Execution of port structures
Worksite figures
- Dolphin length: 32.70 m - Weight: 64 tonnes
- 250 tonnes: installation of mooring hook