Estacade provisoire - Pont Simone Veil
- Coastal and river engineering - Underwater works
- Civil engineering works equipment
Start of works
2019Project owner
BORDEAUX METROPOLEContract
Prime contractor
Total of works Excl. TVA
Construction location
Bordeaux (33) / FranceOffers & solutions
Worksite figures
Pont mixte acier/béton de 550m de long et 44m de large
8 piles en Garonne
2 culées en rive
Trémie rive gauche de 18m de large avec tranchée couverte