Eric Tabarly cable-stayed bridge

Structure with metal deck for crossing the Loire River and construction of a pier in a cofferdam and two abutments. Massive abutment C0 weight including maintenance facilities for anchors and stays founded on reinforced and nailed soil, anchored to the pre-stressed deck.

  • Civil engineering works

    • Bridges
    • Specific and exceptional structures
pont-a-haubans-eric-tabarly-etpo-nantes-travaux-publics-ouvrages-d-art-et-genie-civil-1
pont-a-haubans-eric-tabarly-etpo-nantes-travaux-publics-ouvrages-d-art-et-genie-civil-2 pont-a-haubans-eric-tabarly-etpo-nantes-travaux-publics-ouvrages-d-art-et-genie-civil-3 pont-a-haubans-eric-tabarly-etpo-nantes-travaux-publics-ouvrages-d-art-et-genie-civil-4 pont-a-haubans-eric-tabarly-etpo-nantes-travaux-publics-ouvrages-d-art-et-genie-civil-5

Start of works

2008

Project owner

NANTES METROPOLE

Contract

  • Transportation
  • Roadways

Prime contractor

SETEC TPI

Total of works Excl. TVA

27 335 000

Construction location

NANTES / FRANCE

Offers & solutions

  • Execution of port structures

Worksite figures

  1. Length: 210 m - Width: 27.40 m
  2. 5182 m3 concrete
  3. Pier 260-m long- 4.10-m wide and 11.70-m high.
  4. 48 x HP 400 piles