Rennes Metro
Line B (work package 3) with a north covered trench and associated station built inside a berliner wall
- Civil engineering works
- Covered trenches and shafts





Start of works
2014Project owner
SEMTCARContract
- Transportation
- Railway
Prime contractor
EGIS RAIL - EGIS BAT. CENTRE OUEST - ARCADIS ESG - L'HEUDE & L'HEUDETotal of works Excl. TVA
33 128 000Construction location
RENNES / FRANCEOffers & solutions
- Execution of port structures
Worksite figures
- Length: 1.2 km
- Width: 6 m
- Duration of the worksite: 33 months