Repair of bridge on A6 highway
Repair and reinforcement on civil engineering works using additional rebar
- Special works / Maintenance
- Civil engineering works equipment
- Preparation and protection of surfaces
- Repair and reinforcement of structures
- Additional rebar
- Shotblasting
- Hydroblasting
- Hydrodemolition
- Flat carbon steel
- Replacement of holding systems
- Bored driven, presscrete piles
- Sawing and boring




Start of works
2016Project owner
Direction des routes Île-de-France - Service de Modernisation du Réseau (SMR)Contract
- Transportation
- Roadways
Prime contractor
Direction des routes Île-de-France - Direction Ingénierie et Ouvrages d'Art (DIOA)Total of works Excl. TVA
873 807Construction location
Ormoy (Essonne) / FRANCEOffers & solutions
- Global repair/restoration offer
Worksite figures
- 18,000 bores and embeddings
- 168 heavy and light supports installed in structure intrados
- 120 m3 of concrete
- 14 tonnes of steel